A Fire Risk Assessment by Identifying and Analyzing the Potential Hazards and the Risks – Report Example

Download full paperFile format: .doc, available for editing

The paper A Fire Risk Assessment by Identifying and Analyzing the Potential Hazards and the Risks " is a perfect example of a report ion management.   In the UK, the government has embarked on modernizing the fire and rescue service through the office of the deputy prime minister. Using the national framework document, the government has come up with an integrated risk management plan. The plan was set up to achieve a number of fundamental things. The plan aims at identifying potential and existing risk to a community, examine the efficiency of current response and preventive arrangements, to determine standards and policies for intervention and prevention and identify openings for improvement, and establish the required resources in meeting the standards and policies.

The integrated risk management policies are not only designed to substitute national standards for fire and rescue with local ones. In addition, they entail the shifting of concentration in planning to prioritizing people, examining the risks that emerge from a variety of fires, and the opportunity for their management and reduction. For the MPs to be effective, they need to adopt a risk-managed, fully integrated approach to the safety of the community, fire safety enforcement, and inspection, the response arrangements during emergencies that will result in an environment that is safer. Qualitative and Quantitative risk evaluation. Risk analysis is an important managerial process that is required to spot potential and existing hazards, vulnerabilities, and threats that can affect the overall performance and set-up of an organization.

This can be done in two ways; either quantitatively or qualitatively. In carrying out a fire risk assessment, it is crucial to differentiate the two types of risk analyses. Qualitative risk analysis seeks to obtain safety against imminent risks and increase the awareness of personnel, team members, and management who are susceptible to risks.

It is designed to spot issues that are considered as project management barriers but can become specific risk factors. A comprehensive qualitative assessment also aims at identifying the resources which are most vulnerable to risks. The aim is to identify correctional measures that can be used to eliminate or reduce the causes of risks, and to make sure that the safety measures implemented are integrated into the risk related protocols to be used in the future.

References

Bachman, G. E. “Common pre-incident intelligence failures”. Fire engineering. 156.3 (2005): 166-169.

Draper, Brian. Isle of Man fire and rescue service; integrated risk management plan 2006-2010. Onchan, Isle of Man: Isle of Man fire and rescue service, 2006.

Fire Brigade Union. Integrated risk management planning; the national document. FBU national IRMP department, 2004.

Hancock, D. C. Fire-assessment; a practical guide. Thames, Middlesex. Chubb fire Ltd, 2000.

Norman, Thomson. Fire hazards in industry. Amsterdam: Elsevier, 2001.

Perry, Pat. Risk assessments questions and answers; a practical approach. London: Thomas Telford, 2003.

Pickstone, Warren. Integrated risk management; its application within greater Manchester fire and rescue service. United Kingdom: Greater Manchester fire and rescue service, 2005.

Wilkie, C. A, and Grand, A. F. Fire retardancy of polymeric materials. London: CRC press, 2000.

Yung, D. Principles of fire risk assessment in buildings. New York: John Wiley & Sons, 2008.

Download full paperFile format: .doc, available for editing
Contact Us