StudentShare
Contact Us
Sign In / Sign Up for FREE
Search
Go to advanced search...

Project Management: Planning & Design - Essay Example

Cite this document
Summary
The world bank planning on rural roads in sub-Saharan Africa has been mainly focused on route selection and subsequent determination of appropriate level of improvement largely based on geometric design standards, rather than optimization of given resources over the network…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER92.6% of users find it useful
Project Management: Planning & Design
Read Text Preview

Extract of sample "Project Management: Planning & Design"

Download file to see previous pages

Local Community Participation along with other criteria such as economic, social etc. should be the principal basis for economic returns. For example the Malawi district road improvement and maintenance program has clear priorities and allocation formulae develops for the whole roads sub-sector, including rural roads - word programs were prepared using an HND-type model based on road deterioration and vehicle operation costs. For roads, priorities were assessed using economic criteria plus social factors and engineering judgment although not rigorous, the system does produce a practical means of planning within the roads sub-sector.

It would be desirable to develop similar methods elsewhere in sub-Saharan Africa as an AID to sectoral planning. The planning process introduces in Kenya and Malawi used a combination of economic and social criteria. The successes recorded were as a result of the clear definition and understanding at project preparation stage. Use was made of existing district level planning capacity, working in Kenya through district development committees and were broadly accepted by the government. The banks involvement in these two projects has indicated that the development of local planning capacity takes place over a succession of projects, and not within the three to five years period of a single project.

Sectoral and regional planning is bound to be much influenced by national planning, and will hence will be at least partly political. Planners at all levels need to have firm policy guidelines within which to work and to get these, an agreed rural road strategy is required in each country. The according to in-country abilities. The most successful operation have been where these exists a competent central authority to act as a focus, coupled with maximum local participation from the outset.The principal aim of donor operations in rural roads in sub-Saharan Africa is the development of logical rural road strategies to guide sectoral and regional planning.

In arriving at a suitable rural road planning systems. Merits in a simple but formal, methodology to assess priorities between regions and within the sector are considered inputs include a range of agricultural, engineering, demographic, educational and social parameters. The main problems operate within the limitations of easily available and reliable data and weight are assured to the different parameters methodologies used in world Bank's projects for route selection are substantially improved by:(1) the inclusion of population densities in the process(2) the introduction of target road densities as additional criterion; and(3) the improvement of traffic demand under low flow conditions.

Current projects emphasize maintenance through the adoption of consolidation processes for planning and programming of maintenance, as well as improvement and rehabilitation. The more advanced road authorities uses intervention criteria based on road condition, maintenance costs, traffic data and budget levels to set maintenance programs. Few sub-Saharan African countries now have an adequate institutional planning of their rural roads. Some countries collect simple and reliable data, such as per kilometer costs and maintenance perimeter wider prevailing conditions, to assist rural road maintenance planning.

The review of experience shows the advantages of a well established country strategy for rural roads in most countries, the development of

...Download file to see next pages Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“Project Management: Planning & Design Essay Example | Topics and Well Written Essays - 1750 words”, n.d.)
Project Management: Planning & Design Essay Example | Topics and Well Written Essays - 1750 words. Retrieved from https://studentshare.org/miscellaneous/1508488-project-management-planning-design
(Project Management: Planning & Design Essay Example | Topics and Well Written Essays - 1750 Words)
Project Management: Planning & Design Essay Example | Topics and Well Written Essays - 1750 Words. https://studentshare.org/miscellaneous/1508488-project-management-planning-design.
“Project Management: Planning & Design Essay Example | Topics and Well Written Essays - 1750 Words”, n.d. https://studentshare.org/miscellaneous/1508488-project-management-planning-design.
  • Cited: 0 times

CHECK THESE SAMPLES OF Project Management: Planning & Design

Design Project Management

This assignment "Design project management" shows that Dar Alaskan is a prominent Riyadh-based Company of Saudi Arabia, engaged in the business of design and construction of Real Estate development.... It is focused on the design, planning, and construction of Residential Housing.... he Company(DAAR) is presently executing one of its most design and construction significant projects, reflecting the true state of the art in Real estate development—the  SHAMS ARRIYADH project....
24 Pages (6000 words) Assignment

Engineering and Construction. Four Categories of Construction

In the building construction of commercial buildings, private or public procurement methodologies such as cost estimation, price negotiation, management contracting and design-build bridging are applied (Hornbostel, 1991).... In addition, there are the economic aspects of building construction and design that have greatly influenced the building construction industry in the world.... Nevertheless, in situations where property owners are experienced and conversant with building construction, careful and detailed planning has always ensured positive outcome of building construction projects....
9 Pages (2250 words) Research Paper

Project Management: Requirements of Construction Projects

uccessful project management is the process of planning, organizing, directing and controlling the elements of the project to meet the project needs (T.... (The Evolution of project management in Construction Projects) Project managers can come from a variety of backgrounds, but will need to have the necessary skills and competencies to manage all aspects of the project from inception to occupation.... A considerable amount of planning is to be done in a This necessitates a ‘leader' to be appointed for the temporary team of different people, whose sole objective is to fulfill the client's requirements....
9 Pages (2250 words) Essay

The Use of Different Project Management Tools and Techniques in the Design of Marketing Projects

The report also focuses identifying relevant details on the assessment of the information needs of… These also include the identification of the contribution of the use of the project management tools to the enhancement and development of The paper also depicts the understanding of the relevant application of the project management tools with techniques in various situations.... According to Kennnaugh (2010), it also involves the designing, development and the planning of substantial marketing programs with the use of project management tools and techniques....
12 Pages (3000 words) Assignment

Lean Six Sigma

The first S, Sort, intends to eradicate whatever is not needed in the production process.... The second S, Set in Order, focuses on organizing the remaining items deemed necessary for the production process.... The… The fourth S, standardize, intend to set standards on which the other three Ss above (shine, Set in Order and shine) operate....
7 Pages (1750 words) Assignment

Design Project Management, Space Area Program

The reporter describes Dar Alarkan as a prominent Riyadh based Company of Saudi Arabia, engaged in the business of design and construction of Real Estate development.... It is focused on design, planning and construction of Residential Housing in accordance with Master Plans and catering to lifestyle Housing Clients.... he Company(DAAR) is presently executing one of its most design and construction significant projects, reflecting the true state of the art in Real estate development—the  SHAMS ARRIYADH project....
18 Pages (4500 words) Assignment

Building Constructions against Fire Disaster

In most cases, the owner of such properties plays the role of both a laborer and a paymaster in the design team.... All projects of construction have some similarities and these similarities are such as their design, legal and financial considerations.... he cost of constructing a building is also a very important factor to consider because when the cost is not affordable then it becomes hard for the design team to continue working on the project....
20 Pages (5000 words) Term Paper

Fire Safety Design in Buildings

This case study "Fire Safety design in Buildings" presents a fire safety design that ensures that the building has been constructed in a way that it cannot be destroyed by any form of destruction.... Fire safety design in buildings in the U.... is done in reference to the approved building document B....
20 Pages (5000 words) Case Study
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us